We've been busy all spring and into summer, which unfortunately has left this site lacking. I've been running the show in MA with James in TN milling and learning construction. Although the good news is the team will be back together mid-September.
Below is only a sample of what I've been up to. In less than 5 months, I've milled 100 thousand bdft of lumber, ranging from pine boards and timber frames to highly figured live edge slabs (and more birdseye maple than we've ever seen). Although that does include roughly 5000 bdft of chainsaw milling and 6500 sqft of flooring, the Wood-Mizer has handled the vast majority of the work, and is running better than ever.
Plenty more work awaits, and I'd be happy to add yours to the list.
Opmerkingen